What a stage-gate has to hold
Each gate needs the requirement, the evidence, the owner, and the kill criteria. A date without those four is a status meeting.
Resources
Short notes on the artifacts these engagements leave behind.
Each gate needs the requirement, the evidence, the owner, and the kill criteria. A date without those four is a status meeting.
Requirement id, input, expected result, actual result, timestamp, and the person or system that ran it. If any of those are missing, the record is incomplete.
Weights on hardware you control, no third-party model API, and a runbook your staff can operate. If the weights cannot transfer, you do not own the system.